Essential Subfloor Tips: What to Do BEFORE Installing Sheathing
The video emphasizes the importance of completing all the work on the subfloor before installing the roof sheathing. This includes plumbing, electrical, leveling the dirt, and anything else that needs to go in before insulation and sheathing are installed.
Then warns against the common mistake of rushing into framing the house before completing the subfloor work. Once the roof sheathing and insulation are installed, accessing the crawl space becomes significantly more difficult and nightmarish.
Here are the key points covered in the video:
Complete all rough-ins before installing the subfloor sheathing: Electrical conduit, plumbing pipes, and any other necessary components need to be installed before laying down the subfloor sheathing. Once the sheathing is installed, crawling under the house to make modifications becomes extremely difficult.
Leveling the dirt: The video recommends leveling the dirt crawl space to meet the local building code. This is important because building inspectors typically require crawl spaces to have a minimum clearance from the bottom of the joist to the top of the floor.
Building inspection: The video highlights the importance of getting a building inspection before installing the subfloor sheathing. This ensures that the framing is up to code and there are no plumbing leaks. Inspectors typically revisit the site to perform another inspection after the sheathing is installed.
Planning is key: By planning all the rough-in work beforehand, homeowners can avoid the hassle of having to crawl under the house later to fix mistakes or make additions.
In conclusion, this serves as a valuable reminder for those working on a subfloor to prioritize completing all the rough-in work before installing the subfloor sheathing.
This will save time, effort, and frustration in the long run.